Install Bolt hold open only. $355.00 on completion

Product Details

The 1927A-1 uses the “third Hand” to hold the bolt open to insert the drum. Send your Trigger frame and by installing the simulated full auto/single switch the pawl that holds the bolt open is controlled by the position of the switch. The process involved is to drill the hole in the frame, make a new hardened pawl, modify the sear and disconnector, new pivot plate and new rocker pivot(switch) .

Install Blot hold open requires you to ship the lower receiver. Payment is due after completion.

drill for selector $50.00
modify sear $30.00
modify disconector $20.00
drill for rocker $40.00
rocker pivot plate $65.00
pawl $75.00
rocker pivot smooth $60.00
$340.00

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.